Get Prepared to buy and sell property with confidence

Private pipes, septic tanks and water assets

Written by Lindel Enticott | Nov 18, 2026, 10:48:51 PM
From 2,042 Victorian contracts of sale · Feb to Nov 2026

Who looks after the pipes?

Private connections, septic tanks and the water assets under your land.

Most Melbourne homes connect straight to the water authority’s mains.

Some don’t, and the difference is in the Section 32.

Authority main
Water authority maintains
 
Private extension
Owners pay to fix it
 
Your home
Service may vary
276
contracts disclosed private pipes the owner maintains
66
had no mains sewer connection
The short answer

If a property is served by a private water or sewer extension, the owners generally pay to fix problems within it, not the water authority.

If it relies on a septic tank, the owner maintains it. Some properties also have water authority pipes running under the land.

The water authority’s information statement in the Section 32 is where to look, before you sign.

Turn on the tap.

Flush the toilet.

You don’t think about where it goes.

Until it stops working.

For most homes, the pipes that matter belong to the water authority.

For some, a stretch of pipe between the main and the house belongs to the owners.

And when that stretch fails, so does the assumption that someone else will fix it.

The Section 32 tells you which kind of home you’re buying.

What we found in the Section 32

Here’s what the water and sewerage disclosures showed across the 2,042 contracts we reviewed between February and November 2026.

What the Section 32 disclosed
Contracts
Private pipes running from the authority’s main (a private extension) that the owners are responsible for
276
A private shared-main agreement, with owners responsible for maintaining the shared pipes
19
No mains sewer: the property relies on a septic tank
60
The water certificate showed no sewer connection, although the vendor statement said sewerage was available
6

Four contracts had both a private extension and a shared-main agreement.

These numbers are about location

Septic tanks and private connections cluster in particular areas and property types.

So these counts describe the 2,042 contracts we reviewed between February and November 2026, not Victoria as a whole.

Private extensions

Your pipes, your repair bill

Some properties connect to the main through a private extension. In the information statements we see, the water authority notes three things:

  1. 1
    The pipes may run some distance

    before they reach the authority’s main.

  2. 2
    The owners pay to fix it

    If there’s a maintenance or supply problem within the private extension, the owners pay to fix it, not the water authority.

  3. 3
    No guarantee of service

    The water authority doesn’t guarantee continuity of service, water quality or pressure within the private extension.

Shared extensions
 
 
 
 
 
 
 

If neighbours share the extension, a problem in one section can affect several homes.

Septic tanks

No mains sewer? The tank is yours.

3–5
years between pump-outs, as a guide

If there’s no mains sewer, the property relies on a septic tank or similar system.

The owner looks after it.

As a guide, tanks usually need pumping out every three to five years.

Check the documents agree

In six contracts, the vendor statement said sewerage was available, but the water certificate showed the property wasn’t connected.

There’s also the question of the future. If the area is connected to mains sewer later, owners may be required to connect, and that can involve significant costs.

Under the surface

Water assets under the land

Some properties have sewerage or water authority assets running under the land even where no easement is registered on the plan.

You generally can’t build over or near those assets without the authority’s say.

Water information statements and asset plans are important here.

Pipes aren’t always exactly where the plan shows. Before any digging, contact Before You Dig Australia.

Before you sign

What to check before you sign

  1. 1
    Check what services are connected

    Look at the vendor statement disclosure.

  2. 2
    Find the water authority’s information statement

    It’s in the Section 32.

  3. 3
    Look for the tell-tale words

    Words like “private extension” or “private sewer”.

  4. 4
    Test it when you inspect

    Run the taps, check the water pressure and flush the toilets.

  5. 5
    Ask about any septic tank

    Ask where it is, when it was last pumped out, and for any service records. Consider a professional inspection.

  6. 6
    Ask before you plan to build

    If you plan to build or extend, get the asset plan and ask the water authority before you sign.

  7. 7
    Before any digging

    Contact Before You Dig Australia. Pipes aren’t always exactly where the plan shows.

Keep reading

Find out who fixes the pipes before you own them.

Send us the contract before you sign.

Our free information review flags what the water authority’s statement says, along with everything else that needs your attention.

How we counted

We counted distinct Victorian contracts with a published review between February and November 2026 where our review recorded a private extension, a private shared-main agreement, a septic tank with no mains sewer connection, or a water certificate showing no sewer connection. These figures describe what was disclosed. They’re not an inspection of the services.

Important information

This article is general information about Victorian contracts of sale. It is not legal advice, and it is not tailored to your property, your contract or your circumstances.

The figures come from contracts reviewed by Prepared between February and November 2026, across metropolitan Melbourne. They describe what sellers disclosed in those contracts. They are not an inspection of the properties, and they do not tell you what any other contract contains.

The figures reflect how our reviewers classified each contract against our library of legal issues. That is a judgement, not a measurement. Contracts are drafted differently, the same disclosure can reasonably fall under more than one heading, and closely related situations are grouped together for reporting. Treat these numbers as a close indication of how common something is, not an exact count. A figure may shift slightly as our library and our review process develop.

The law changes. This article was published on 18/11/2026 and was current at that date.

Every property is different. Before you sign a contract of sale, have your own contract reviewed.