What it means if you plan to build.
For most owners, nothing changes day to day.
It matters when you plan bigger works, so it’s worth knowing before you buy.
239 of the 2,042 contracts we reviewed were in an area of Aboriginal cultural heritage sensitivity.
Some land in Victoria is mapped as an area of Aboriginal cultural heritage sensitivity under the Aboriginal Heritage Act 2006.
If you plan a high impact activity there, such as building three or more homes or subdividing into three or more lots, you’ll generally need an approved Cultural Heritage Management Plan before your planning permit can be granted.
Building one or two homes, extending, or subdividing into two lots generally doesn’t trigger a plan. You can check the map before you buy.
Of the 2,042 Victorian contracts we reviewed between February and November 2026, 239 (12%) disclosed that the land was in an area of Aboriginal cultural heritage sensitivity.
Whether land falls in one of these areas is entirely about where it is.
So this count reflects where our clients buy. It isn’t a measure of Victoria.
These areas protect places where Aboriginal cultural heritage is present, or likely to be.
They’re defined in the Aboriginal Heritage Regulations and include:
They’re mapped on the Aboriginal Cultural Heritage Register and Information System (ACHRIS).
Think about your plans for the land, not just the house that’s on it today.
A management plan is generally required when a high impact activity is planned in an area of sensitivity.
A plan is prepared by a heritage adviser and evaluated by the Registered Aboriginal Party for the area, or by First Peoples – State Relations where there isn’t one.
It takes time and adds cost, so it belongs in your plans and your budget from the start.
Doing works that harm Aboriginal cultural heritage without the right approval is an offence under the Aboriginal Heritage Act 2006.
Check the planning information in the Section 32, or look up the address on ACHRIS.
If you’re planning three or more dwellings, or three or more lots, get early planning advice before you sign.
Ask what your plans would need.
Build the time and cost of a management plan into your timeline and budget.
Send us the contract before you sign.
Our free information review flags planning matters like this one, along with everything else that needs your attention.
We counted distinct Victorian contracts with a published review between February and November 2026 where the planning material or a cultural heritage search showed the land was within an area of Aboriginal cultural heritage sensitivity.
This article is general information about Victorian contracts of sale. It is not legal advice, and it is not tailored to your property, your contract or your circumstances.
The figures come from contracts reviewed by Prepared between February and November 2026, across metropolitan Melbourne. They describe what sellers disclosed in those contracts. They are not an inspection of the properties, and they do not tell you what any other contract contains.
The figures reflect how our reviewers classified each contract against our library of legal issues. That is a judgement, not a measurement. Contracts are drafted differently, the same disclosure can reasonably fall under more than one heading, and closely related situations are grouped together for reporting. Treat these numbers as a close indication of how common something is, not an exact count. A figure may shift slightly as our library and our review process develop.
The law changes. This article was published on 18/11/2026 and was current at that date.
Every property is different. Before you sign a contract of sale, have your own contract reviewed.